Steps involved in Setting up of
an Enterprise |
|
| |
1)
Project Selection |
|
| |
2)
Technology & Machinery |
|
| |
3)
Arranging Finances |
|
| |
4)
Unit Development |
|
| |
5)
Filing of Entrepreneur's
Memorandum |
|
| |
6)
Approvals |
|
| |
7)
Clearances |
|
| |
|
|
| |
|
|
| |
|
|
| |
Project Selection |
|
| |
|
It all begins with an Idea
|
|
The
overriding reason for anyone to think of establishing a MSME
unit can be summarised in one word - opportunity. An opportunity
to provide a product or service, which can generate sufficient
surplus. This is all the more true if one is a believer in the
maxim, "Small is Beautiful".
|
|
However, ideas need to
be filtered through a multi-layer sieve. This model is shown in
the following flow:
|
- Does the idea fire up your motivation?
- Is it a viable business proposition in your area?
- Does it match the needs of your clientele?
- Check it out with basic market research
- Test it out at market place
- Consult with the experts
- Look out for competition in the field
- Is it a sunrise industry?
- Your business opportunity
- Project conceptualization
|
|
Once the
ideas are screened and a viable business opportunity emerges the
project has to be conceptualized in all its dimensions. The 4 Ps
of Project Conception is:
|
- PRODUCT (Shape,
Size and Nature)
- PROCESS (Technology
to produce the product)
- PLACE (Location
of Plant)
- PARTNER (Technological
of Financial Collaborator)
|
Making a Product Choice
|
|
In a
project conceptualization stage while making a product choice
following factors are related to product need to be considered:
|
- Product Line - Depth, Width
- Packaging
- Branding
- Warranties
- After Sales Service
|
|
Some other factors that
one should consider while finalizing the product choice are:
|
- Ease of availability of raw-material
- Process Technology
- Accessibility to the market
- Incentive and support from Government
|
|
Market information is
also important for product selection. Products, which are likely
to have a number of players in the market, are best avoided.
Some such products in the recent past have been plastic
footwear, audio cassettes, disposable gloves and bulk drugs.
|
|
In case the
entrepreneur is looking for a product, which has export
potential, the following additional questions need to be asked:
|
- What should be the contents of export-product
portfolio?
- What are the special requirements for packaging if one
has to export the products?
- What product adaptations are needed to be made for
exporting a product to a specific country?
- Are any WTO conditionalities involved e.g. "child
labour free", ISO 9000 certified, GMP followed etc.
|
|
The development of
export-product portfolio can be done by considering 4 parameters
viz.
|
- External demand conditions
- Internal supply capability
- Complexity of marketing tasks
- Amount of investment required to penetrate the market
|
|
Analysis can be
conducted using this four dimensional model. The obvious choice
is a product which scores a high rating on first two parameters
and low rating on last two parameters.
|
|
EXIM (Export Import
Bank of India) Bank has also developed an excellent model to
conduct the export-product portfolio analysis based on three
parameters viz.
|
|
|
|
This analysis gives rise to product
groups with high potential or low potential.
|
|
With regard to special
packaging requirements one has to be careful about laws of the
country one is exporting to. For instance, while exporting to
Australia, wooden-packaging cannot be done.
|
|
Product adaptations for
country's specific needs look into things like whether voltage
supply is 220V or 110V for electric appliances and for
automobiles whether left-hand drive or right-hand drive is
appropriate.
|
|
It has
now become important to understand the implications of the
various agreements which form part of WTO.
|
|
Once the
product is finalised, choices of process technology
emerge.
|
|
|
| |
go top |
|
| |
|
|
| |
Technology
& Machinery |
|
| |
|
Process Selection
|
|
Choices of process
technology emerge once the product is finalised. For some
complex products, process know how has to be imported. In such
cases agreements for technology transfer should be made with due
care to safeguard interest. A lot of appropriate technology is
being developed at CSIR and Defense Research Labs and some of
this technology can now be bought. Indigenously developed
process know-how has intrinsic benefits such as appropriateness
and relative inexpensiveness.
|
|
While checking out on a
process technology, the following things need to be considered
with utmost care:
|
|
-
|
Whether process requires very
high level of skilled workers or complex machines?
|
| - |
Whether process requires large
quantities of water and/or power?
|
| - |
Whether any process or product patent
needs to be honoured while utilising the selected
process technology. |
| - |
Any special pollution or
environmental regulations.
|
| - |
Finally, the
appropriateness to the indian environment and
conditions. Machinery and equipment
|
|
|
One of
the major deficiencies in the micro, small and medium
enterprises scenario is the prevalence of outdated production
and management methods hindering the efficient operation of
micro, small and medium-scale units. It was also found that the
most important reason for the reluctance of the small
industrialists to install modern machinery and equipment was the
lack of investible funds. The main objective of National micro,
small and medium enterprises (NMSME) is to provide machinery and
equipment to small industrial units offering them long repayment
period with moderate rate of interest.
|
|
NSIC procedures for hire purchase of
machinery
|
|
-
|
The hire
purchase application is to be made on the prescribed
form.
|
|
-
|
The Director of
Industries of the State under whose jurisdiction the
applicant falls, forwards the application to the head
office of the NSIC at Delhi with his recommendation and
comments.
|
|
-
|
All
applications for indigenous or imported machines are
considered by acceptance committees comprising of the
representatives of the Chief Controller of Imports,
Development Commissioner, micro, small and medium
enterprises and other concerned departments.
|
|
-
|
Decision of
these committees is conveyed to the parties concerned
with copies to the regional offices of the NSIC and the
concerned Directorate of Industries.
|
|
-
|
Once all these
formalities are completed by the hirer, instructions are
sent to the suppliers to dispatch the consignment (duly
insured for transit risk) to the hirer and to send the
R/R or C/R as the case may be, to the regional office
|
|
-
|
The NSIC after
ensuring that all dues have been paid by the hirer,
releases the R/R or C/R to him for taking delivery of
the machines.
|
|
-
|
In case of
imported machines, the procedure is slightly different
in as much as the shipping documents are sent to the
clearing agents for clearing the consignment from the
Customs and dispatching it to the hirer.
|
|
|
Value of machines that can be
supplied
|
Rs. 7.5 Lacs, F.O.R. or landed cost as the case may be.
|
|
Earnest Money
|
5% or 10% of the value of machinery depending on whether
the equipment is imported or indigenous. In the case of
furnaces and a few other items of equipment, the rate of
earnest money is different. Interest 9 per cent per
annum with a rebate of 2 per cent on prompt payment.
This interest is calculated on the value of machines
outstanding after deducting payment of earnest money.
|
|
Administrative Charge
|
2 per cent on the sales value of machines and its
recovery by the NSIC is spread over the total
installment period.
|
|
Period of Repayment
|
The value of the machines, after deducting the earnest
money received, called the Balance Value, is payable
alongwith interest and administrative charge in 7 years.
|
|
- The first installment
is payable after one year and six months from the delivery of
machines
|
|
- The second and subsequent installment
are payable half-yearly thereafter.
|
|
Gestation Period
|
In case of certain type of machines which become
operative immediately on installation in the service
sector industries and job order establishment, a
gestation period of only 6 months shall be allowed both
to the new and existing units.
|
|
A rebate of 2% per annum is allowed on
the interest rates, in case an installment is paid on or before
the due date.
|
|
In case the payment of
installment is not made within one month of the specified due
date, interest @ 2% per annum over and above the normal rate is
charged on the defaulted amount from the date of default to the
date of actual payment. Remission in interests is allowed in
case one or more than one installment is paid in advance of the
due date(s).
Now the Place and Right
Partner has to be
selected and Project
Report has to be
prepared.
|
|
|
| |
go top |
|
| |
|
|
| |
Arranging Finances |
|
| |
|
No MSME unit can take off without
monetary support. This need for finance can be classified into
following types:
|
- Long and medium term loans
- Short term or working capital requirements
- Risk Capital
- Seed Capital/Marginal Money
- Bridge loans
|
|
Financial assistance in
India for MSME units is available from a variety of
institutions. The important ones are:
(i)
Commercial/Regional Rural/Co-operative Banks.
(ii) SIDBI: Small Industries Development Bank of India
(refinance and direct lending)
(iii) SFCs/SIDCs: State Financial Corporations (e.g. Delhi
Financial Corporation)/State Industrial Development
Corporations.
|
|
|
Long and medium term
loans are provided by SFCs, SIDBI and SIDCs. Banks also finance
term loans. This type of financing is needed to fund purchase of
land, construction of factory building/shed and for purchase of
machinery and equipment. The short-term loans are required for
working capital requirements, which fund the purchase of raw
materials and consumables, payment of wages and other immediate
manufacturing and administrative expenses. Such loans are
generally available from commercial banks. The commercial banks
also sanction composite loan comprising of working capital and
term loan up to a loan limit of Rs.1 crore.
For loans from
financial institutions and commercial banks a formal application
needs to be made. The details of documentation that need to be
provided with the loan application are indicated below:
- Documentation for Loan
Application
- Balance Sheet and Profit Loss Statement for last three
consecutive years of firms owned by promoters
- Income Tax Assessment Certificates of Partners/Directors
- Proof of Possession of Land/Building
- Architect’s estimate for construction cost
- Partnership deed/Memorandum and Articles of Associations of
Company
- Project Report
- Budgetary Quotations of Plant and Machinery
A sanction or rejection
letter is issued by bank after its assessment of the
application. After receiving a sanction letter, applicants need
to indicate in writing their acceptance of terms and conditions
laid down by FI/Banks.
Subsequently, loan is disbursed according to the phased
implementation of the project. In today’s environment there are
other choices apart from commercial banks and Government owned
financial institutions. These options include venture capital
funds and non-government finance companies.
|
|
|
| |
go top |
|
| |
|
|
| |
Unit
Development |
|
| |
|
After deciding the issues of product
and process, the next important question is where to set the
unit up?
|
|
For many tiny units and service-based
units, the home is perhaps the best starting point.
|
|
Setting
up an establishment is much more than putting a signboard up and
waiting for customers to walk in. It requires negotiating a
favourable plot or shed purchase, organising for proper
construction of building, design of interiors and finding good
deals for equipment and machinery.
|
Construction of Building
|
|
Once an industrial plot
for the unit is secured, then the next job is that of finding a
suitable architect. Design of factory building has to be in
consonance with the type of industry and have an appropriate
plant layout.
|
|
An
architect's estimate of building construction is essential for
loan applications. Further, architect's certificate for money
spent on building is needed for disbursement of loan.
|
Getting the Utility Connections
|
|
Among the utilities of
prime importance are power and water. In many cases getting
power connection causes delay in setting up of plant. Therefore
it is imperative to commence work on these aspects with diligent
follow up. Power connections are generally of either LT (Low
Tension) or HT (High-tension) type. If connected load is upto 75
HP, LT connection is provided. For connected loads of 130 HP or
higher only HT connection is provided.
|
|
A formal
application needs to be made in a specified form to the state
electricity board. An electrical inspector is deputed for
evaluation of application to factory site, after which the load
is sanctioned. In areas of power shortage, it is advisable to
augment the power supply with a captive generating set.
|
|
Water
connection is also obtained likewise by applying in advance in
formal forms. The water supply can be augmented by installation
of tubewell.
|
Getting 3M's Right
|
Men
|
|
Projections for manpower and staffing are made in the project
report. However it is necessary to time the induction of
manpower in a planned manner. The engineers and operatives must
be available before the installation of the machinery.
|
Machinery
|
|
Choosing
and ordering of right machinery is also of paramount importance.
In many cases technology or process provides us with
specifications which is not provided, then an extensive
techno-economic survey of machinery and equipment available must
be carried out. International trade fairs and engineering fairs
are good places to look at available options. The entrepreneur
must also consult experts, dealers / suppliers as well as users,
prior to making a selection of equipment and machinery. The
advice of DIC, MSMEI and NSIC can also be sought.
|
Materials
|
|
Materials procurement
and planning are critical to success, of a start-up with a MSME
unit. Inventory management can lead to manageable cash flow
situations; otherwise if too much is ordered too soon
considerable amount of working capital gets locked up. On the
other hand, non-availability may result in production hold-ups,
and idle machine and manpower. For essential imported raw
material whose lead-time is large proper planning is all the
more essential.
|
|
|
| |
go top |
|
| |
|
|
| |
Filing
of Entrepreneur's Memorandum |
|
| |
Section 8 of the Micro,
Small and Medium Enterprises Development (MSMED) Act, 2006 provides
for filing of memorandum by a Micro, Small or Medium Enterprise.
Sub-section (2) of section 8 stipulates that the form of the Memorandum,
the procedure of its filing and other matters incidental thereto shall
be such as notified by
the Central Government.
Download Registration Forms & Related Documents
(Proforma)
File
Format for Entrepreneurs Memorandum
Features of the Scheme
-
The procedure for filing it has been outlined in Schedule. II of
the Notification for
the format of EM
Procedure for Filing Memoranda
Features of the present procedures are as follows:
-
Form of the Entrepreneurs Memorandum can be downloaded from the
Internet, the address of which can be obtained from Directorate
dealing with Micro, Small & Medium Enterprises of the State
Governments/ UTs. or the hard copies of the same can be
obtained from the District Industries Centres. This form can
also be downloaded from the SIDO website i.e.
www.laghu-udyog.com or www.dcmsme.gov.in
-
Any person who intends to establish a micro or small enterprise,
at his discretion; or a medium enterprise engaged in providing
or rendering of services may, at his discretion or a medium
enterprise engaged in the manufacture or production of goods
shall file the Memorandum of Micro, Small or as the case may
be, of Medium Enterprise with District Industries Centre of its
area.
-
The District Industries Centre shall fill all the codes in the
form of the Memorandum and issue an acknowledgement after
allotting an EM number, date of issue and category of the unit
within five days of the receipt of the form of Memorandum by
post or same day, if the form of Memorandum is submitted in
person as well as online.
-
Before issuing the acknowledgement, the District Industries
Centers shall make sure that the form is complete in all respect
and particularly the form is signed and is accompanied with an
undertaking, which is a part of the form of Entrepreneurs
Memorandum.
-
The form of Memorandum is in two parts. Any person who intends
to establish a micro, small or medium enterprise engaged in
providing or rendering of services may file or those who want to
establish medium enterprise engaged in the production or
manufacture of products shall file Part 1 of the Entrepreneurs
Memorandum to District Industries Centre.
-
The District Industries Centre shall, in addition of keeping a
record, in writing, shall also maintain records electronically
on computer.
The following form basis of evaluation:
-
The unit has obtained all necessary clearances whether statutory
or administrative. e.g. drug license under drug control order,
NOC from Pollution Control Board, if required etc.
-
Unit does not violate any locational restrictions in force, at
the time of evaluation.
-
Value of plant and machinery is within prescribed limits.
-
Unit is not owned, controlled or subsidiary of any other
industrial undertaking as per notification
|
|
| |
go top |
|
| |
|
|
| |
Approvals |
|
| |
|
Every MSME unit has to
comply with various regulations in force. These include
regulatory, taxation, environmental and certain product specific
clearances. This section looks into the methodology of obtaining
these approvals and clearances.
|
Exemption from Compulsory License
|
|
Licensing in the
Industries sector is governed by the licensing exemption
notification issued by Govt. of India in July 25 1991 under the
Industries (Development and Regulation) Act, 1951. In SSI, there
are virtually no licensing restrictions. No industrial license
is required except in case of 6 product groups included in
compulsory licensing (these products groups mainly cover
products that can only be made in large sector.)
|
|
But if a small-scale
unit employs less than 50/100 workers with/without power then it
would not require a license from the Govt. of India even for the
6 product groups covered in licensing under Schedule II of the
notification.
|
|
Subject to this, an
entrepreneur can set up a SSI unit anywhere in the country
without any restriction. The units are, of course, subject to
the locational/land use and zoning restrictions in force under
the local laws.
|
|
|
| |
go top |
|
| |
|
|
| |
Clearances |
|
| |
|
An entrepreneur has to obtain several
clearances or permissions depending upon the nature of his unit
and products manufactured.
|
|
|
|
|
Regulatory or Taxation Clearances
|
1.
|
Registration under Sales Tax
Act - Commercial Tax officer of area concerned
|
|
2.
|
Registration under Central
Excise Act - Collector of Central Excise or his nominee
for area
|
|
3.
|
Payment of Income Tax - ITO of
the area concerned
|
|
4.
|
Registration of Partnership
deed - Inspector General of area concerned
|
|
5.
|
Calibration of weights &
measures - Weights and Measures Inspector of State
|
|
6.
|
Power Connection - Designated
Officer of State Electricity Board
|
|
7.
|
Employee strength exceeding 10
with power connection or 20 without power - Chief
Inspector of Factories
|
|
Environment & Pollution Related Clearances
The method of granting consent
under water and air pollution to SSI units has been simplified. Except
for 17 critically polluting sectors given below, in all other cases SSI
units will merely have to file an application and obtain an
acknowledgement which will serve the purpose of consent:-
|
1.
|
Fertilizer (Nitrogen/Phosphate)
|
|
2.
|
Sugar
|
|
3.
|
Cement
|
|
4.
|
Fermentation & Distillery
|
|
5.
|
Aluminium
|
|
6.
|
Petrochemicals
|
|
7.
|
Thermal Power
|
|
8.
|
Oil refinery
|
|
9.
|
Sulphuric Acid
|
|
10.
|
Tanneries
|
|
11.
|
Copper smelter
|
|
12.
|
Zinc smelter
|
|
13.
|
Iron & Steel
|
|
14.
|
Pulp & Paper
|
|
15.
|
Dye and Dye intermediates
|
|
16.
|
Pesticides manufacturing and
formulation
|
|
17.
|
Basic Drugs and Pharmaceuticals
|
Product Specific Clearances
|
1.
|
Establishing a Printing Press -
District Magistrate
|
|
2.
|
License for Cold Storage Construction -
Designated Official in State
|
|
3.
|
Pesticides - Central/State Agricultural
Department - Ministry of Agriculture
|
|
4.
|
Drugs and Pharmaceuticals - Drug
license from State Drug Controller
|
|
5.
|
Safety Matches/ Fireworks - License
under Explosives Act from Directorate of Explosives, Nagpur
|
|
6.
|
Household Electrical Appliances -
License from Bureau of Indian Standards
|
|
7.
|
Wood Working Industry within 8 km from
forest - District Forest Officer
|
|
8.
|
Milk Processing & Milk
products manufacturing units - Approval under Milk and Milk
Products Order from State Agricultural/ Food Processing
Industries Department above a designated capacity.
|
|
|
| |
go top |
|
| |
|
|
| |
Quality Certification
|
|
| |
Quality certification has become extremely important in
competitive markets and especially in gaining foothold in
exports. To avail the certification of ISO-9000, a unit has to
undertake significant costs; the small scale industries have
been found wanting mainly on account of resource crunch to
implement quality systems to obtain this certification. However,
as a paradigm shift, SSI must make 'Quality' a way of life.
It has been decided to push
the quality upgradation programme in the SSI Sector in a big way.
A scheme has
been launched to give financial incentive to those SSI units who
acquire ISO-9000 certification, by reimbursing 75% of their costs of
obtaining certification, subject to a maximum of Rs. 0.75 lacs per
unit.
In order to
promote modernisation and technology upgradation in SSI, the units
are assisted in improving the quality of their products.
A new scheme
has been launched to assist SSI units in obtaining ISO-9000 or an
equivalent international quality standard. Subject to an upper
ceiling of Rs. 075 lacs, each unit is given financial assistance
equal to 75% of the costs incurred in acquiring the quality
standard.
The SSI
units are also encouraged to participate in quality awareness and
learning programmes organised specially for their benefit
|
|
| |
go top |
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Forms
|
|
| |
Format of Entrepreneurs’ Memorandum Under The MSMED ACT 2006 -
Click here to download |
|
| |
|
|
| |
go top |
|
| |
|
|